River bank protection having Gabion-strengthened toe with 16m Apron underlain by Geotextile filter (laid under 5-8m deep water level) for scour prevention & mitigation.

River bank protection
Before
River bank protection
After

Protection of River bank (silty-clay & sloughening soil) against severely induced erosion during floods – rise and drawdown, with strengthened toe and geotextile-lain apron & Geomattress (sand tubular mattress) on slope to protect it against Rain-cuts.

Protection of River bank
Before
Protection of River bank
After

Construction of Bank with Multi-layered (4) RME system embedded into existing embankment with 16m long apron anchored down by composite Megabags and gaps filled with HDPE bags.

Construction of Bank
Before
Construction of Bank
After

River toe strengthening with RME and CMB & interlaced with Geomattress (tubular sand mattress) laid on slope as protection against Rain-cuts and slope erosion.

River toe strengthening
Before
River toe strengthening
After

Construction of River Bank with embedded RME system into toe, apron & scour-flaps, and slope protected with Geomattress (tubular sand mattress) anchored atop the oth HDPE bags. 1.21Km Long river bank, 3.5m deep at bank line, & area filled with silt and sand – finished in just 23 effective days.

Construction of River Bank
Before
Construction of River Bank
After

RME System-based Bank-cum-slope construction for protection of massive Tea Garden Land acreage (in a highly flashy river) and Power Distribution Towers of PGCIL, GoI’s Maharatna.

RME System-based Bank-cum-slope
Before
RME System-based Bank-cum-slope
After