River bank protection having Gabion-strengthened toe with 16m Apron underlain by Geotextile filter (laid under 5-8m deep water level) for scour prevention & mitigation.

Before

After
Protection of River bank (silty-clay & sloughening soil) against severely induced erosion during floods – rise and drawdown, with strengthened toe and geotextile-lain apron & Geomattress (sand tubular mattress) on slope to protect it against Rain-cuts.

Before

After
Construction of Bank with Multi-layered (4) RME system embedded into existing embankment with 16m long apron anchored down by composite Megabags and gaps filled with HDPE bags.

Before

After
River toe strengthening with RME and CMB & interlaced with Geomattress (tubular sand mattress) laid on slope as protection against Rain-cuts and slope erosion.

Before

After
Construction of River Bank with embedded RME system into toe, apron & scour-flaps, and slope protected with Geomattress (tubular sand mattress) anchored atop the oth HDPE bags. 1.21Km Long river bank, 3.5m deep at bank line, & area filled with silt and sand – finished in just 23 effective days.

Before

After
RME System-based Bank-cum-slope construction for protection of massive Tea Garden Land acreage (in a highly flashy river) and Power Distribution Towers of PGCIL, GoI’s Maharatna.

Before